Asbestos work in Pico Rivera follows South Coast Air Quality Management District Rule 1403. The rule asks for a survey prior to any demolition or renovation activity, with a carve-out for a single-unit dwelling when a renovation removes less than 100 square feet of asbestos-containing material.
Half of Pico Rivera’s homes were built in or before 1957, and more than 8 in every 10 of them predate 1980. A remodel or teardown in Pico Rivera brings asbestos questions with it, and those questions are our part of the job.
Ceiling, floor and wall materials removed before a house is demolished
Example project
Home
1950s one-story house in Pico Rivera, to be torn down for a new home
Original request
Demolish the house and build new
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture, the floor tile and mastic, the wall plaster and the duct wrap
Found
Asbestos in the ceiling texture, the floor mastic and the duct wrap
Clear
The wall plaster and the floor tile
Area
About 2,100 sq ft of ceiling, floor and duct material
Timeline
Notice no later than 10 working days ahead, filed before the city permit application, then six working days
Cost
$19,500
In this example, the owner of a 1950s house in Pico Rivera is tearing it down for a new home. The city’s permit FAQ asks every demolition applicant to deal with the air district before applying for the city permit. With the district, that step is the notification, which a demolition always needs.
A remodel here starts with sampling of every flooring layer down to the joists, plus the wall and ceiling cavities the job opens, and asbestos testing covers all of it.
Ceilings
Texture overhead can contain asbestos in an older house, so popcorn ceiling removal waits on the lab result.
Floors
Pulling up an old kitchen or hall floor? The tile, the sheet vinyl and the mastic are each sent to a lab, and the lab report is in hand before floor tile and mastic removal begins.
Walls
The survey rule reaches into wall and ceiling cavities as far as the job needs, so what sits inside them is identified and sampled before work starts. In Pico Rivera, that is the first step of our drywall, joint compound and plaster removal.
Heating and cooling
Under Rule 1403, an HVAC system that goes in or comes out is a renovation. Sampling of the duct and pipe insulation comes first, then HVAC duct and pipe insulation removal, and only afterward does your heating and cooling contractor start.
Remodels and teardowns
Demolition under Rule 1403 includes a bearing wall coming out as much as a house coming down, so the district notice applies, and the asbestos goes first through renovation and demolition abatement.
Pico Rivera housing
Households in Pico Rivera are mostly in one-unit homes, at about 81 percent, and about 30 percent rent. A rented house still counts as a single-unit dwelling for the survey carve-out, while apartment buildings, townhouses and condominiums do not.
Pico Rivera’s older stock is mainly from the 1950s through the 1970s, about 69 percent of all homes, with only about 17 percent from before 1950.
Pico Rivera’s FAQ tells anyone applying for a demolition permit to deal with the district beforehand, calling it clearance, and points to state rules on disposing of lead and asbestos. From the district’s side, the step is a notification, and the abatement contractor files it online no later than 10 working days before the work.
Applying for the demolition permit means handing over a copy of that notification too, a step state law adds according to the district.
Contractors file it, online, in the district’s Rule 1403 web application, and the notification fee is paid at the same time. We file for our own jobs.
Does a small kitchen job need a survey?
Small kitchen jobs are covered by a survey carve-out only when the dwelling is single-unit and the renovation removes less than 100 square feet of asbestos-containing material. Apartments, townhouses and condominiums fall outside it, and testing still tells you how much material there is.
Who tests the air at the end?
Clearance air monitoring is the independent consultant’s task. We cannot do it ourselves, because the Business and Professions Code bars contractors from providing it.
What should a bid show?
Bidders should give you a license number. For a job of 100 square feet or more, add two checks: Cal/OSHA registration, and a C-22 Asbestos Abatement classification or an asbestos-exam qualifier on the license, which the Contractors State License Board can confirm.
If your address is in Willowbrook, read asbestos removal in Willowbrook instead, and use the home page for an overview of every service. Both pages follow the same district rules.