Interior finishes
Wall and ceiling finishes that contain asbestos come out before the remodel starts, following what the survey found in each room.
Typical cost in Lynwood
Remodel abatement and teardown abatement are separate jobs under South Coast Air Quality Management District Rule 1403, and in Lynwood we cover the asbestos side of both ahead of the crew doing the remodel or teardown.
Under the rule, demolition means wrecking or taking out a load-supporting structural member, which makes a bearing wall coming out demolition. Stripping or removing building parts, and installing or removing HVAC systems, count as renovation.

Wall and ceiling finishes that contain asbestos come out before the remodel starts, following what the survey found in each room.
Floors, walls and ceilings open up together in a kitchen or bath remodel, so one job can involve several materials. We plan the abatement around the whole list from the survey.
If a whole house is coming down, the job is demolition. A district notice is filed whether or not the survey finds asbestos, and anything it does find is removed before the demolition crew begins.
Institutional, commercial, public, industrial and residential structures all fall under the rule. A church hall or a small commercial building meets the same survey and notice questions as a house, and the single-unit carve-out never covers apartment buildings.
Online filing through the district’s Rule 1403 Notification Web Application is the abatement contractor’s job, and it must land no later than 10 working days before demolition, or before renovation of 100 square feet or more, along with a district notification fee. Per the district, state law then asks demolition permit applicants for a copy of the notification.
Clearance air monitoring goes to an independent consultant, because state law bars contractors from doing it.
Jobs of 100 square feet or more of asbestos-containing material change what a contractor must hold. Its license needs the C-22 Asbestos Abatement classification, or else a qualifier who has passed the exam for asbestos work, and a Cal/OSHA registration should be on file. Ask to see both.

Teardown plans start with a survey, so see asbestos testing first, and the home page has the other services if your project is smaller.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (424) 452-2968