Example Asbestos Removal Projects in Lynwood

The seven example jobs below are set in Lynwood, Pico Rivera and Willowbrook, mostly in houses from the 1940s and 1950s. Each one lists what was sampled, what came out, the work days and an estimated cost.

Skim coat removed from the kitchen and dining room walls before new drywall

Example project

Home
1950s house in Lynwood with plaster walls in the kitchen and the dining room
Original request
Strip both rooms back and hang new drywall
Testing
A Cal/OSHA-certified asbestos consultant samples the skim coat, the base plaster and the compound at the window trim
Found
Asbestos in the skim coat on both rooms’ walls
Clear
The base plaster and the trim compound
Area
About 400 sq ft of wall
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$4,800

Scope of work

Samples of each layer, the district notice, both rooms sealed with air filters running, the skim coat removed wet, bagging and the haul. The clearance air test, the new drywall and the paint are separate.

Project overview

In this example, the owners of a 1950s house in Lynwood are opening up the kitchen and dining room walls for new drywall and wiring. The plaster has a thin skim coat that was added over the years.

The skim coat tests positive and the base plaster is clear. The abatement crew takes the skim coat off both rooms, and the drywall crew starts after the air results.

The goal

The goal is bare plaster in both rooms, so the new drywall goes up with the old skim coat gone.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the walls in both rooms.
  2. Before work The abatement contractor files the district notice online and the owners empty both rooms.
  3. Days one to three The rooms are sealed and the skim coat is removed from the walls wet.
  4. Last An independent consultant tests the air, then the drywall crew starts.

Planning right

  • Empty the cabinets and take down the window coverings.
  • Plan to cook elsewhere for the three work days.
  • Hold the drywall delivery until the air results.
  • Keep the lab report with the permit papers.

Get a free quoteMore about drywall, joint compound and plaster removal

Ceiling, floor and wall materials removed before a house is demolished

Example project

Home
1950s one-story house in Pico Rivera, to be torn down for a new home
Original request
Demolish the house and build new
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture, the floor tile and mastic, the wall plaster and the duct wrap
Found
Asbestos in the ceiling texture, the floor mastic and the duct wrap
Clear
The wall plaster and the floor tile
Area
About 2,100 sq ft of ceiling, floor and duct material
Timeline
Notice no later than 10 working days ahead, filed before the city permit application, then six working days
Cost
$19,500

Scope of work

Samples from every room, the district notice, the house sealed in sections with air filters running, the positive materials removed wet, bagging and the haul. The clearance air test, the wrecking and the lot cleanup are separate.

Project overview

In this example, the owner of a 1950s house in Pico Rivera is tearing it down for a new home. The city’s permit FAQ asks every demolition applicant to deal with the air district before applying for the city permit. With the district, that step is the notification, which a demolition always needs.

Three materials test positive. The abatement contractor files the notice online, removes them before the demolition, and the owner applies for the city permit with the notice in hand.

The goal

The goal is a house with the positive materials removed and the district step done, so the city permit application is complete.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples every room and the attic ducts.
  2. Before work The contractor files the district notice online, ahead of the city permit application.
  3. Days one to six The house is sealed in sections and the ceiling texture, floor mastic and duct wrap come out wet.
  4. Last An independent consultant tests the air, then the wrecking crew starts.

Planning right

  • Keep the district notice with the demolition permit papers.
  • Ask for a copy of the waste manifest when the job ends.
  • Shut off the utilities before the crew arrives.
  • Book the wrecking crew after the air results.

Get a free quoteMore about renovation and demolition abatement

Bathroom floor tile removed before a remodel under a county alteration permit

Example project

Home
1960s house in unincorporated Willowbrook with an original bathroom floor of small tiles
Original request
Remodel the bathroom under a permit from the county
Testing
A Cal/OSHA-certified asbestos consultant samples the floor tile, the mastic and the wall compound
Found
Asbestos in the floor tile and the mastic
Clear
The wall compound
Area
About 60 sq ft of floor
Timeline
Less than 100 square feet of renovation, so no district notice; the county notification form goes with the alteration permit, then one working day
Cost
$2,300

Scope of work

Samples, the bathroom sealed, the tile lifted and the mastic removed wet to the subfloor, bagging, a cleanup and the haul. The survey, the county notification form, the clearance air test and the new floor are separate.

Project overview

In this example, a Willowbrook family is remodeling the bathroom of a 1960s house. Willowbrook is unincorporated, so the permit comes from the county, and the county’s referral sheet asks for a notification form with an alteration permit where asbestos is involved.

The floor tile and its mastic test positive. The abatement crew removes them in a day, and the form goes in with the permit application.

The goal

The goal is a bare bathroom subfloor and a county permit file that already carries the asbestos form.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the floor and the walls.
  2. Before work The owner submits the alteration permit with the county notification form.
  3. Work day The bathroom is sealed and the tile is lifted by hand, the mastic coming off wet.
  4. Then An independent consultant tests the air and the remodel crew begins.

Planning right

  • Keep the county notification form with the lab report.
  • Use another bathroom for the work day.
  • Hold the new tile order until the air results.
  • Take the vanity out only if the contractor asks.

Get a free quoteMore about floor tile and mastic removal

Hallway ceiling texture removed, with the wall compound sampled alongside

Example project

Home
1940s house in Lynwood with a long hallway between the bedrooms and the bath
Original request
Smooth the hallway ceiling and repaint the hall
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture and the joint compound on the hall walls
Found
Asbestos in the ceiling texture
Clear
The wall joint compound
Area
About 140 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then one working day
Cost
$1,800

Scope of work

Samples of the ceiling and the walls, the district notice, the hallway sealed with air filters running, the texture soaked and scraped into bags, a HEPA clean and the haul. The clearance air test and the smoothing and paint are separate.

Project overview

In this example, the owners of a 1940s house want a smooth ceiling and fresh paint in the hall that links the bedrooms. Both the texture overhead and the compound at the wall seams are sampled.

Only the ceiling texture tests positive. The abatement crew removes it in a day, and the painter sands the walls as ordinary work.

The goal

The goal is a bare hallway ceiling, so the smoothing and paint go on over a surface that has been sampled.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceiling and the wall seams.
  2. Before work The contractor files the district notice online and the owners clear the hall.
  3. Work day The hallway is sealed and the texture is soaked and scraped into bags.
  4. Last An independent consultant tests the air before the painter starts.

Planning right

  • Take pictures and rugs out of the hall.
  • Keep the bedroom doors shut with plastic over them.
  • Book the painter for after the air results.
  • Keep the lab report with the house papers.

Get a free quoteMore about popcorn ceiling removal

Every flooring layer sampled in a vacated duplex unit

Example project

Home
1950s duplex in Lynwood, with the rear unit empty between tenants
Original request
Replace the floors in the rear unit before the next tenant
Testing
A Cal/OSHA-certified asbestos consultant samples each flooring layer in the kitchen and hall, from the carpet pad down to the subfloor
Found
Asbestos in the tile layer under the vinyl and its mastic
Clear
The carpet pad and the top vinyl
Timeline
Samples, then lab results, then a short report
Estimated testing cost
$700

Scope of work

A visit by the consultant, a set of samples from each layer in the kitchen and hall, a lab result for each and a short report that marks the sample spots. Removing the positive layer is priced on its own.

Project overview

In this example, the owner of a 1950s duplex is replacing the floors of the vacated rear unit. The survey comes first and samples every layer of the old flooring.

Each layer is sampled down to the subfloor. The tile under the top vinyl tests positive, so the abatement crew is booked to remove it before the flooring crew starts.

The goal

The goal is a report showing every layer in the unit, so the flooring crew knows what is under the top vinyl.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples each layer in the kitchen and the hall.
  2. Results The lab reports each sample, with the lower tile and mastic positive.
  3. Next The abatement crew is booked to remove that layer.
  4. Then The flooring crew starts once the subfloor is bare.

Planning right

  • Give the consultant the keys while the unit is empty.
  • Ask for each layer to be listed in the report.
  • Hold the flooring order until the positive layer is out.
  • Keep the report with the property file.

Get a free quoteMore about asbestos testing and surveys

Duct wrap removed at the furnace before a rear addition is connected

Example project

Home
1952 house in Lynwood with a rear bedroom and bath being added off the back
Original request
Extend the heating duct from the hall closet furnace into the addition
Testing
A Cal/OSHA-certified asbestos consultant samples the wrap on the main duct near the furnace and the tape at its joints
Found
Asbestos in the wrap on the main duct
Clear
The joint tape
Area
About 25 ft of duct wrap
Timeline
Less than 100 square feet of asbestos-containing material removed, so no district notice, then one working day
Cost
$1,900

Scope of work

The hall closet and the attic hatch sealed, wet removal of the wrap on the main duct into labeled bags, a cleanup and the haul. The survey, the clearance air test and the new duct run are separate.

Project overview

In this example, the owners of a 1952 house are adding a bedroom and a bath at the back. The heating crew has to branch a new duct off the main run beside the furnace.

The wrap on the main duct tests positive. The abatement crew removes it first, so the heating crew cuts into bare duct.

The goal

The goal is bare duct at the furnace, so the new branch is connected to clean metal.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the wrap beside the furnace.
  2. Results The wrap is positive and the tape is clear.
  3. Work day The closet and the attic are sealed and the wrap is wetted, cut off and bagged.
  4. Then The heating crew adds the new branch.

Planning right

  • Empty the hall closet.
  • Ask the heating crew to start the day after.
  • Plan to be without the heater for a day.
  • Keep the lab report with the addition permit.

Get a free quoteMore about HVAC duct and pipe insulation removal

Floor tile and mastic removed from a church hall before a renovation

Example project

Home
1950s church hall in Lynwood with a large tiled floor, a kitchen and two classrooms
Original request
Replace the flooring throughout the hall as part of a renovation
Testing
A Cal/OSHA-certified asbestos consultant samples the tile and the mastic in the hall, the kitchen and each classroom
Found
Asbestos in the tile and mastic in the hall and the kitchen
Clear
The classroom floors
Area
About 1,100 sq ft of floor
Timeline
Notice no later than 10 working days ahead, then five working days
Cost
$8,800

Scope of work

Samples from each room, the district notice, the hall and kitchen sealed in turn with air filters running, the tile and mastic removed wet, bagging and the haul. The clearance air test and the new flooring are separate.

Project overview

In this example, a congregation is renovating its 1950s hall and replacing the flooring. A church hall is not a residential single-unit dwelling, so the survey comes first, and the job is 100 square feet or more, so it carries the district notice.

The tile and mastic test positive in the hall and the kitchen, and the classrooms are clear. The abatement crew works in sections so the classrooms can stay in use.

The goal

The goal is bare floors in the hall and kitchen, so the renovation continues on clean subfloors.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the hall, the kitchen and the classrooms.
  2. Before work The contractor files the district notice online and the congregation schedules the days the hall is closed.
  3. Days one to five The hall and the kitchen are sealed in turn and the tile and mastic come up wet.
  4. Last An independent consultant tests the air before the new flooring is ordered.

Planning right

  • Clear chairs, tables and the piano before the crew arrives.
  • Tell the congregation which days the hall is closed.
  • Order the new flooring for after the air results.
  • Keep the district notice with the renovation file.

Get a free quoteMore about floor tile and mastic removal