Drywall, Joint Compound and Plaster Removal in Lynwood

Typical cost in Lynwood

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+

Opening a wall raises the same question as any other renovation, which is what is in it. The district’s survey rule asks for the material in wall and ceiling cavities to be identified and sampled as necessary.

Drywall, joint compound and plaster all sit inside that survey. We remove the ones that contain asbestos before the wall or ceiling comes apart, and the work follows the notice and contractor rules that apply at its size.

Request a free quote
Bathroom opened for a remodel, with the wall beside the tub cut back to the wood studs, plastic sheeting hanging at the left and pink and teal tile on the floor and shower wall.

Wall and ceiling work

Drywall and joint compound

Drywall sheets and the joint compound over the seams are separate materials, and each gets its own sample. The results tell you whether the wall needs asbestos work before it opens.

Plaster

Plaster walls and ceilings are sampled through each layer the work will open, and plaster that contains asbestos comes out before the wall comes apart.

A kitchen or bath remodel

Taking out a tub wall, a cabinet run or a bathroom floor opens walls and floors at the same time. The survey covers each of them, and the plan follows the results.

Taking out a bearing wall

A bearing wall coming out changes the job’s category. The district calls that demolition even when the rest of the house is just a remodel, which brings the district notice, and the demolition permit application then needs a copy of it under state law as the district explains.

Notice and contractor rules

Small renovations sit outside the district’s notice and training rules when they remove less than 100 square feet of asbestos-containing material, in any building type. Larger ones need the abatement contractor’s online notice, due no later than 10 working days ahead.

Contractor at 100 square feet or more

Registering with Cal/OSHA before work starts is the employer’s duty once a job reaches 100 square feet or more of asbestos-containing material. The Contractors State License Board adds the C-22 Asbestos Abatement classification, or a qualifier who passed the asbestos exam, as the contractor’s side of the same threshold.

Entry hall with a wooden staircase where small orange-brown patches are taped to the textured ceiling and the wall, and sample bags and papers lie on the bottom step and floor.

Walls can come down along with a floor or ceiling, so our floor tile and mastic removal page may apply, and the home page lists the rest.